If you live in Gloucestershire and you’re replacing an ageing oil, LPG or gas boiler, the Boiler Upgrade Scheme (BUS) can take £7,500 to £9,000 straight off the cost of a heat pump. With much of the county off the mains gas grid — from the Forest of Dean to the Cotswolds and the Stroud valleys — Gloucestershire homes are among those that stand to gain the most. Here’s how the grant works, who qualifies, and why the choice of installer makes all the difference to what you pay to run it.
What is the Boiler Upgrade Scheme?
The Boiler Upgrade Scheme is the UK government’s flagship grant for low-carbon heating. Administered by Ofgem and funded by the Department for Energy Security and Net Zero, it helps homeowners and small businesses in England and Wales replace fossil-fuel heating with a heat pump. The scheme is funded through to March 2028, so this is genuine, fully-backed money available now.
The grant pays:
- £7,500 towards an eligible air-source or ground-source heat pump.
- £9,000 for eligible off-gas-grid homes currently heated by oil or LPG — a temporary uplift available from 21 July 2026 to 31 March 2027. This matters in Gloucestershire, where a large share of rural properties rely on oil or LPG.
You don’t apply for the grant yourself — your installer does, and the value is deducted directly from your bill. There’s no waiting for a rebate and no upfront outlay of the grant amount.
Who qualifies?
To be eligible, broadly you need to:
- Own the property (homeowner or private landlord), residential or small commercial.
- Be replacing an existing fossil-fuel or electric heating system in an existing building (not a new build).
- Hold a valid EPC — any rating, as the previous minimum insulation requirements were removed in May 2024.
- Not have previously received a BUS or RHI grant for a heat pump at the property.
A few things to note: hybrid systems (a gas boiler paired with a heat pump) are not eligible, and there’s a maximum system size of 45kWth, which covers the vast majority of homes. The grant covers the heat pump and core installation; additional works such as radiator upgrades, a new hot water cylinder or insulation are quoted separately.
One condition underpins everything: the installer must be MCS-certified. No certification, no grant. This is where your choice of installer matters more than most homeowners realise.
Why use PBT as your Gloucestershire installer

A heat pump is only as good as the system it sits within. The grant gets you the unit; a proper integrator gets you a home that’s genuinely warm, efficient and cheap to run. That distinction is the whole of what we do.
We’re whole-house specialists, not box-fitters. PBT designs and installs complete electrified homes — heat pumps, solar PV, battery storage, underfloor heating and smart controls as one coherent system. Most installers fit a heat pump to whatever’s already there. We design the heating, generation and storage to work together, so your grant-funded heat pump delivers its lowest possible running cost from day one.
Proper design, not guesswork. We started as plumbers and heating engineers and grew into a systems integrator. That trade foundation means our heat loss calculations, emitter sizing and flow temperatures are right — which is what determines whether a heat pump is efficient or expensive. For an off-grid Gloucestershire home coming off oil or LPG, a well-designed system on the right tariff can cut running costs significantly.
Manufacturer-grade partnerships. We work with a fixed, carefully chosen set of leading manufacturers — Stiebel Eltron heat pumps, Solarwatt solar, BYD and Tesla battery storage, Roth underfloor heating, and Loxone controls — rather than chasing the cheapest available kit. That gives you better hardware, proper warranties and a system built to last.
We handle the grant and the paperwork. As an MCS-certified installer, we manage the full BUS application and apply the grant value directly to your quote. You see a net price, and you only pay the balance. No forms, no chasing Ofgem, no upfront grant outlay.
Future-ready from the start. Because we install the whole system, adding solar, a battery or smart controls later is straightforward — the groundwork is already there. You’re not locked into a single appliance; you’re starting a home energy system you can build on.
Frequently asked questions
How much is the heat pump grant in Gloucestershire?
The Boiler Upgrade Scheme provides £7,500 towards an air-source or ground-source heat pump. From 21 July 2026 to 31 March 2027, eligible off-gas-grid homes currently heated by oil or LPG can claim £9,000 — relevant to many rural Gloucestershire properties.
Do I have to apply for the grant myself?
No. Your MCS-certified installer applies on your behalf and deducts the grant value directly from your invoice, so you only pay the net amount.
Is my Gloucestershire home eligible?
Generally, if you own an existing property with a valid EPC, are replacing a fossil-fuel or electric heating system, and haven’t had a previous heat pump grant at the property, you’re likely eligible. We confirm this for you as part of a free assessment.
Does the grant cover the whole cost of a heat pump?
The grant covers the heat pump and core installation. Additional works such as radiator upgrades, a new hot water cylinder or insulation are quoted separately and depend on your home.
How long is the Boiler Upgrade Scheme available?
The scheme is funded until March 2028, but the enhanced £9,000 off-gas-grid uplift runs only until 31 March 2027. If you’re on oil or LPG, acting sooner secures the higher amount.
Find out what your home qualifies for
The grant is fully funded and available now, but the £9,000 off-gas-grid uplift runs only until 31 March 2027 — and across rural Gloucestershire, that’s the timing that matters most. Get in touch with PBT for a free, no-obligation assessment. We’ll confirm your eligibility, design a system around your home, and show you exactly what you’ll pay after the grant.